Fieldwork began in autumn 2001 and to date three fields have been monitored in
detail:
|
Field A was treated with
biosolids in October 2001 and was monitored during autumn/winter 2001/2002 and 2002/2003.
A further application of biosolids was made in November 2004 and monitoring is continuing
through the winter of 2004-2005. |
Field A 
|
Field B 
|
Field B was treated with
biosolids in November 2002 and was monitored during autumn/winter 2002/2003. This field is also being currently monitored after application of
biosolids in September 2004. |
Field C was treated with
biosolids in September 2003 and was monitored during autumn/winter 2003/2004. Monitoring is continuing as a second year after application study. | Field
C  |
|
|
©